Maedke Construction

Home | About us | See it happen | Custom homes | Contact us

See it happen!

From start to finish

1735 sq. ft. Custome Home

House footing poured.

Deluxe 4 ft. walls for a spacious crawl space.

Floor framing on house.

House floor complete, backfilling.

1st two house walls.

House walls all up.

Garage floor poured and cut.

Exterior framing on house complete.

Truss delivery.

Setting trusses.

Trusses set.

Roof sheething.

Roofing in progress.

Roofing complete.

Interior framing layout.

Interior framing up.

House wiring (panel in garage)

House wrap and windows.

House wrap and windows (rear elevation)

House insulated and energy star certified

Rocked and ready for tape and texture.

Sheetrock complete.

Steps, driveway, gravel, siding.

Sidewalk with steel mesh reinforcement.

Intereior doors: white with wood trim out.

Oak floor ready for cabinets.

Base cabinets.

Cabinets complete.

Kitchen/dining room.

Finished kitchen.

Carpet in, fireplace tile/mantle complete.

Front door trim out.

Jetted tub tiled, grouted, and complete.

Wood casing and jambs on white doors.

Breakfast bar and dining area.